• Docs
  • Talk to an expert

Every prompt, diff, and approval. One record.

Six months from now, you can still answer why a change happened. The full chain, from the original issue to the final approval, is captured automatically as it happens.

Use Upsun Dispatch for freeTalk to an expert

Without Upsun Dispatch

No trace of intent

The prompt, the context, and the reasoning behind a change disappear the moment the session ends.

Git only records the what

A commit message says what changed. It rarely says why and never says what an agent tried and rejected first.

Nothing to hand an auditor

When compliance asks how a change was verified, "the developer said it looked fine" isn't an answer.

The full chain, captured as it happens, not recreated after.

Upsun Dispatch logs the original issue, the context an agent used, the plan it proposed, and who approved it, as immutable data stored in one place. The same record that satisfies an audit also shows you where a workflow is working and where it isn't.

Built to answer "why" months later

Every run leaves the same record behind, whether anyone ever needs to look at it or not.

  • The originating issue or trigger for every run
  • The full context an agent used to make its decision
  • The plan proposed before any code was written
  • Who approved it, and when
  • Stored as immutable data, permanently linked to the code it produced

What gets captured, and when

At the trigger

The issue, ticket, or event that started the workflow is logged as the first entry in the record.

During the run

Every piece of context an agent reads, and every decision it makes, is captured as it happens.

At the gate

Who approved the change, when, and any feedback given, added to the same record.

After completion

The full run is sealed as a permanent, unchangeable entry.

Built for teams that have to prove what happened

Compliance and audit

Answer "why was this changed, and who approved it" with a record, not a guess.

Security investigations

Trace exactly what an agent saw and did before a change reached production.

Engineering leadership

Understand what shipped and why, without interrupting the engineer who reviewed it.

Regulated industries

Build the audit record that regulated industries expect, ready before compliance has to ask for it.

Incident response

When something breaks, reconstruct exactly what happened instead of starting from scratch.

New team members

Read the reasoning behind a past change without needing to track down whoever approved it.

Stop reconstructing what happened. Start recording it.